Public Consultations

2050 Results: BEREC / Public Consultations
Document Number Document date Document Title Document author
Ares(2025)4600965 Contribution of 1&1 to the public consultation on the draft BEREC Report on the regulation of physical infrastructure access 1&1
Ares(2025)4559872 Contribution of 4iG Group to the public consultation on the draft BEREC Report on the regulation of physical infrastructure access 4iG Group
Ares(2025)4560704 Contribution of AIIP to the public consultation on the draft BEREC Report on the regulation of physical infrastructure access AIIP
Ares(2025)4600986 Contribution of BREKO to the public consultation on the draft BEREC Report on the regulation of physical infrastructure access BREKO
Ares(2025)4560066 Contribution of Deutsche Glasfaser to the public consultation on the draft BEREC Report on the regulation of physical infrastructure access Deutsche Glasfaser
Ares(2025)4560133 Contribution of ECTA to the public consultation on the draft BEREC Report on the regulation of physical infrastructure access ECTA
Ares(2025)4560170 Contribution of FTTH Council Europe to the public consultation on the draft BEREC Report on the regulation of physical infrastructure access FTTH Council Europe
Ares(2025)4560432 Contribution of Stokab to the public consultation on the draft BEREC Report on the regulation of physical infrastructure access Stokab
Ares(2025)4560495 Contribution of VATM to the public consultation on the draft BEREC Report on the regulation of physical infrastructure access VATM
Ares(2025)4600907 Contribution of Vodafone to the public consultation on the draft BEREC Report on the regulation of physical infrastructure access Vodafone
Ares(2025)4521564 Contribution of 1&1 Versatel to the public consultation on the draft BEREC Progress Report on managing copper network switch-off 1&1 Versatel
Ares(2025)4559158 Contribution of 4iG to the public consultation on the draft BEREC Progress Report on managing copper network switch-off 4iG
Ares(2025)4521233 Contribution of AIIP to the public consultation on the draft BEREC Progress Report on managing copper network switch-off AIIP
Ares(2025)4556183 Contribution of AIIP to the public consultation on the draft Report on Infrastructure Sharing as a lever for ECN/ECS Environmental Sustainability AIIP
Ares(2025)4558130 Contribution of BREKO to the public consultation on the draft BEREC Progress Report on managing copper network switch-off BREKO
Ares(2025)4558195 Contribution of Connect Europe to the public consultation on the draft BEREC Progress Report on managing copper network switch-off Connect Europe